Tag Archives: Functional engineering change orders

Synopsys Formality Ultra Speeds Implementing and Verifying of Functional ECOs

Synopsys recently launched Formality Ultra, which is a new configuration of the Formality equivalency checking solution. Formality Ultra enables designers to reduce the time and effort required to implement ECOs. This increases schedule predictability and helps engineers close designs on time. The Synopsys tool gives designers the ability to implement more complex functional changes as engineering change orders rather than wait for the next derivative of the design.

Continue reading